Shell plans to remove the topsides, jacket and bridge of Leman BH platform in the British sector of the North Sea. KCI performed in 2012-2014 the folllowing studies and analyses:
• Feasibility and methodology for decommissioning
• Engineering for the de-commissioning of the
• Leman BH living quarter (LQ) platform
• The bridge from BH to BT platform
• Topdeck removal of the BT platform
• Decommissioning methodology
• Cost estimation
• Site survey inspection
• Weight and COG calculations
• Lifting/transport/on bottom stability analyses