In 2012 KCI performed the installation support to Van Oord for the installation of the WTG foundations for Global Tech I (tripods).
Lifting operation simulation
Modelling of jack-up motions, crane motions, lifting wires & spreader
Installation Support on site
Workability Optimization
Smart Rigging Design
Stabbing Procedure
Additional activities performed:
- Range of supporting activities relating to operations
- Owners engineering for Global Tech I